{"id":1241,"date":"2021-11-05T16:23:28","date_gmt":"2021-11-05T08:23:28","guid":{"rendered":"https:\/\/ceshi.surglab.com\/?p=1241"},"modified":"2021-11-05T16:24:11","modified_gmt":"2021-11-05T08:24:11","slug":"%e9%98%80%e7%bb%84%e5%88%b6%e4%bd%9c%e5%92%8c%e6%8e%a5%e7%ba%bf%e6%96%bd%e5%b7%a5","status":"publish","type":"post","link":"https:\/\/www.surglab.com\/1241","title":{"rendered":"\u9600\u7ec4\u5236\u4f5c\u548c\u63a5\u7ebf\u65bd\u5de5"},"content":{"rendered":"
Project Name\u9879\u76ee\u540d\u79f0:<\/p>\n
Valve\u00a0Rack Fabrication &\u00a0Cabling\u00a0\u00a0\u9600\u7ec4\u5236\u4f5c\u548c\u63a5\u7ebf
Client\u00a0Name\u4e1a\u4e3b\u540d\u79f0:\u00a0\u00a0
CS\u00a0Environmental Equipment (Shanghai) Co.,\u00a0Ltd
Work Scope\u5de5\u4f5c\u8303\u56f4:
1)\u00a0\u7ba1\u9053\uff0c\u9600\u67b6\uff0c\u7ba1\u9053\u914d\u4ef6\uff0c\u4eea\u8868\u9600\u95e8\u538b\u7f29\u7a7a\u6c14\u4f9b\u6c14\u7ba1\u9053\uff08\u03c68\uff09\uff0c\u9600\u7ec4\u5185\u90e8\u7535\u7f06\/\u6865\u67b6\u7b49\u6240\u6709\u9664\u4e86\u9600\u95e8\u4eea\u8868\u6e05\u5355\u4ee5\u5916\u7684\u9644\u5c5e\u914d\u4ef6\u3002
All other\u00a0material necessary except\u00a0buyer\u2019s\u00a0scope of supply in the part list, include piping,\u00a0skids, fitting, instrument air supply piping(\u03c68),\u00a0cable\/cable tray, etc. (4mm orifice in the P&ID\u00a0are scope\u00a0of Seller).
2)\u00a0\u5236\u4f5c\u64ac\u5757\u6846\u67b6\u548c\u710a\u63a5\u7ec4\u88c5\u9600\u95e8\u4eea\u8868\uff0c\u5305\u62ec\u4eea\u8868\u7a7a\u6c14\u7684\u5206\u914d\u548c\u5b89\u88c5
Fabrication\u00a0of\u00a0valve rack\u00a0frames, welding and assembling valves and instruments onto skids,\u00a0including instrument\u00a0air installation for all\u00a0users
3)\u00a0\u4eea\u8868\u9600\u95e8\u7684\u6865\u67b6\u9700\u8981\u9884\u5236\u5728\u9600\u7ec4\u4e0a.The\u00a0cable tray will be prefabricated\u00a0and installed\u00a0on the valve rack.
4)\u00a0\u6309\u7167\u56fe\u7eb8\u7684\u55b7\u6f06\u8981\u6c42\u548c\u989c\u8272\u8fdb\u884c\u5904\u7406\u548c\u55b7\u6f06\u00a0Post-treatment\u00a0and painting\u00a0should\u00a0be as per requirement in the drawings and related standards.
5)\u00a0\u8fdb\u884c\u6cd5\u5170\u8de8\u63a5\uff0c\u5c04\u7ebf\u63a2\u4f24\uff0c\u8bd5\u538b\u548c\u6240\u6709\u56fe\u7eb8\u6216\u8005\u6807\u51c6\u7684\u8981\u6c42\u7684\u5de5\u4f5c\u3002
Earthing, X-ray\u00a0test, pressure test and other works required should\u00a0in accordance\u00a0with drawings\u00a0and national\u00a0standards.
6)\u00a0\u51fa\u5382\u524d\u9a8c\u6536\u00a0FAT
7)\u00a0\u5305\u88c5\u53d1\u8d27\u00a0Packing and delivery to\u00a0site
8)\u00a0\u63d0\u4ea4\u6587\u4ef6\u548c\u8bc1\u660e\u00a0Documentation and certificates submission<\/p>\n<\/div>\n
<\/p>\n","protected":false},"excerpt":{"rendered":"
\u9600\u7ec4\u5236\u4f5c\u548c\u63a5\u7ebf\u65bd\u5de5 Project Name\u9879\u76ee\u540d\u79f0: Valve\u00a0Rack Fabrication &…<\/p>\n","protected":false},"author":2,"featured_media":1245,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[28],"tags":[],"class_list":["post-1241","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sbaz","category-28","description-off"],"yoast_head":"\n